We've also done TONS of house stuff! (shocker) I don't even know where to start. I guess the pool is a good place, as it was done in Spring of 2015.
The pool was ancient and crumbling. Tiles were falling off, the bullnose edge was cracking, we had leaks, etc. We also had a useless "spa" off to the side that we never used and never planned to use, so we decided to get rid of it. Our pool deck was cracking concrete, so we ripped it out, as well as the backyard walkway leading up to it. It was a massive, annoying, expensive project, but came out really beautifully.
But first, Emerson!
Ok now the pool project:
Finally, in JULY! The project took 3 months total.